Medellin Road BESS (27INR0165)

Medellin Road BESS is a 203.2 MW other interconnection project in Harris, Texas with a current status of withdrawn. It is proposed to connect at Tap Line #42610 FAIRMT - # 41711 WITTER94T2 ckt 94_x000D_ .

203.2 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameMedellin Road BESS
Queue ID27INR0165
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity203.2 MW
StateTexas
CountyHarris
Point of interconnectionTap Line #42610 FAIRMT - # 41711 WITTER94T2 ckt 94_x000D_
Requested (queue) date2024-01-10
Proposed in-service date2027-05-24
Operational date
Withdrawn date2024-12-05
DeveloperHorizon Energy LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata