Meitner 2 Wind (29INR0103)

Meitner 2 Wind is a 709.1 MW other interconnection project in Gray, Texas with a current status of operational. It is proposed to connect at 79000 Gray Substation 345kV.

709.1 MWCapacity
OperationalStatus
GrayMarket
OtherTechnology

Project facts

Canonical nameMeitner 2 Wind
Queue ID29INR0103
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketGray
TechnologyOther
Capacity709.1 MW
StateTexas
CountyGray
Point of interconnection79000 Gray Substation 345kV
Requested (queue) date2025-06-05
Proposed in-service date
Operational date2028-06-30
Withdrawn date
DeveloperIP Meitner, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata