Mercersburg-Milnor 34.5kV (AB1-129)

Mercersburg-Milnor 34.5kV is a 15.0 MW solar interconnection project in Franklin, Pennsylvania with a current status of withdrawn.

15.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMercersburg-Milnor 34.5kV
Queue IDAB1-129
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity15.0 MW
StatePennsylvania
CountyFranklin
Point of interconnection
Requested (queue) date2015-10-29
Proposed in-service date2017-06-30
Operational date
Withdrawn date2016-07-12
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata