Mesquite BESS2 (25INR0766)

Mesquite BESS2 is a 10.0 MW other interconnection project in Cameron, Texas with a current status of active. It is proposed to connect at New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Mesquite TSP Station Code: MESQUITE Load Name: LOAD2 Bus #: PTI Bus Number: 8554 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: #2 .

10.0 MWCapacity
ActiveStatus
CameronMarket
OtherTechnology

Project facts

Canonical nameMesquite BESS2
Queue ID25INR0766
Statusactive
Source status
MarketCameron
TechnologyOther
Capacity10.0 MW
StateTexas
CountyCameron
Point of interconnectionNew DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Mesquite TSP Station Code: MESQUITE Load Name: LOAD2 Bus #: PTI Bus Number: 8554 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: #2
Requested (queue) date
Proposed in-service date2026-06-15
Operational date
Withdrawn date
DeveloperMesquite Clean Energy Center, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata