Miami Wind Energy Center (58765_1)

Miami Wind Energy Center is a 288.6 MW wind interconnection project in Roberts, Texas with a current status of operational.

288.6 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameMiami Wind Energy Center
Queue ID58765_1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity288.6 MW
StateTexas
CountyRoberts
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2014-08-01
Withdrawn date
Developer
Utility / transmission ownerInvenergy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.