Roberts County, Texas — Interconnection Projects

The interXdata warehouse tracks 3 interconnection projects in Roberts, Texas, representing 1,039 MW of requested capacity.

3Total projects
2Active
1Operational
0Withdrawn
1,039 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind2789 MW
Gas1251 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
IP Meitner Wind68204_MEITWWind500.0 MWactiveRoberts, Texas
Miami Wind Energy Center58765_1Wind288.6 MWoperationalRoberts, Texas
Pampa Natural Gas29INR0341Gas250.7 MWactiveRoberts, Texas

Top developers

Developer (canonical)ProjectsCapacity
IP Meitner, LLC1251 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Roberts County.

Start tracking with interXdata