Mica BESS (26INR0610)

Mica BESS is a 80.4 MW battery interconnection project in Harris, Texas with a current status of withdrawn. It is proposed to connect at 42240 CARDIFF 138kV_x000D_ _x000D_ .

80.4 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameMica BESS
Queue ID26INR0610
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity80.4 MW
StateTexas
CountyHarris
Point of interconnection42240 CARDIFF 138kV_x000D_ _x000D_
Requested (queue) date2024-11-18
Proposed in-service date2026-01-31
Operational date
Withdrawn date2025-02-11
DeveloperMica BESS LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata