Mickleton 230kV (Z2-083)

Mickleton 230kV is a 9.0 MW gas interconnection project in Gloucester, New Jersey with a current status of operational.

9.0 MWCapacity
OperationalStatus
—Market
GasTechnology

Project facts

Canonical nameMickleton 230kV
Queue IDZ2-083
Statusoperational
Source statusIn Service
Market—
TechnologyGas
Capacity9.0 MW
StateNew Jersey
CountyGloucester
Point of interconnection—
Requested (queue) date2014-04-29
Proposed in-service date—
Operational date2018-12-31
Withdrawn date—
Developer—
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.