Mickleton 69 kV (AF2-024)

Mickleton 69 kV is a 24.0 MW battery interconnection project in Gloucester, New Jersey with a current status of withdrawn.

24.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameMickleton 69 kV
Queue IDAF2-024
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity24.0 MW
StateNew Jersey
CountyGloucester
Point of interconnection—
Requested (queue) date2019-11-15
Proposed in-service date2028-05-31
Operational date—
Withdrawn date2025-05-07
Developer—
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.