Middle 69 kV (AF2-019)
Middle 69 kV is a 20.0 MW battery interconnection project in Cape May, New Jersey with a current status of active.
20.0 MWCapacity
ActiveStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Middle 69 kV |
|---|---|
| Queue ID | AF2-019 |
| Status | active |
| Source status | Engineering and Procurement |
| Market | — |
| Technology | Battery |
| Capacity | 20.0 MW |
| State | New Jersey |
| County | Cape May |
| Point of interconnection | — |
| Requested (queue) date | 2019-11-15 |
| Proposed in-service date | 2029-04-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | AEC |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-01 | proposed_online_date | 2028-04-30 | 2029-04-30 | medium |
| 2026-07-29 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.