Middle 69kV (U1-065)

Middle 69kV is a 20.0 MW gas interconnection project in Cape May, New Jersey with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameMiddle 69kV
Queue IDU1-065
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity20.0 MW
StateNew Jersey
CountyCape May
Point of interconnection
Requested (queue) date2008-04-07
Proposed in-service date2009-05-01
Operational date
Withdrawn date2009-07-28
Developer
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata