Midway Wind (11INR0054)

Midway Wind is a 162.9 MW wind interconnection project in San Patricio, Texas with a current status of operational. It is proposed to connect at 8961 Whitepoint 138kV.

162.9 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameMidway Wind
Queue ID11INR0054
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity162.9 MW
StateTexas
CountySan Patricio
Point of interconnection8961 Whitepoint 138kV
Requested (queue) date2009-02-25
Proposed in-service date2019-06-29
Operational date2018-12-04
Withdrawn date
DeveloperApex Clean
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.