Midway1 BESS (23INR0688)

Midway1 BESS is a 9.9 MW other interconnection project in Ector, Texas with a current status of operational. It is proposed to connect at Station Code: MIDWY_x000D_ Station name: Midway_x000D_ Load/Load Transformer Name: LDXFMR1_x000D_ PTI Bus number: 1253_x000D_ Transmission level kV: 138kV.

9.9 MWCapacity
OperationalStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameMidway1 BESS
Queue ID23INR0688
Statusoperational
Source statusoperational
MarketERCOT
TechnologyOther
Capacity9.9 MW
StateTexas
CountyEctor
Point of interconnectionStation Code: MIDWY_x000D_ Station name: Midway_x000D_ Load/Load Transformer Name: LDXFMR1_x000D_ PTI Bus number: 1253_x000D_ Transmission level kV: 138kV
Requested (queue) date2023-05-23
Proposed in-service date2025-05-07
Operational date2023-12-01
Withdrawn date
DeveloperMidway BESS LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata