Mifflin (1004)

Mifflin is a 300.0 MW other interconnection project in Sullivan, New York with a current status of withdrawn. It is proposed to connect at Coopers Corner 345 kV.

300.0 MWCapacity
WithdrawnStatus
EMarket
OtherTechnology

Project facts

Canonical nameMifflin
Queue ID1004
Statuswithdrawn
Source status0
MarketE
TechnologyOther
Capacity300.0 MW
StateNew York
CountySullivan
Point of interconnectionCoopers Corner 345 kV
Requested (queue) date2020-04-13
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperRenewable Energy Concepts, Inc.
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.