Millheim-Brush Jct 46kV is a 50.0 MW wind interconnection project in Centre, Pennsylvania with a current status of withdrawn.

50.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameMillheim-Brush Jct 46kV
Queue IDW1-012
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity50.0 MW
StatePennsylvania
CountyCentre
Point of interconnection
Requested (queue) date2010-02-12
Proposed in-service date2013-12-31
Operational date
Withdrawn date2012-05-08
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata