Millhouse Storage (19INR0188)

Millhouse Storage is a 38.0 MW other interconnection project in Jim Wells, Texas with a current status of withdrawn. It is proposed to connect at tap 69kV 8500 Alice - 8889 Stadium.

38.0 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameMillhouse Storage
Queue ID19INR0188
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity38.0 MW
StateTexas
CountyJim Wells
Point of interconnectiontap 69kV 8500 Alice - 8889 Stadium
Requested (queue) date2017-11-12
Proposed in-service date2020-12-31
Operational date
Withdrawn date2021-08-30
DeveloperCypress Creek Renewables
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata