Minotola 138 kV (AB1-169A)

Minotola 138 kV is a 575.0 MW gas interconnection project in Atlantic, New Jersey with a current status of withdrawn.

575.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameMinotola 138 kV
Queue IDAB1-169A
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity575.0 MW
StateNew Jersey
CountyAtlantic
Point of interconnection
Requested (queue) date2015-10-30
Proposed in-service date2020-06-01
Operational date
Withdrawn date2020-07-20
Developer
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.