MISO Queue Project E291 — Hydro in an unlisted county, Texas

MISO Queue Project E291 — Hydro in an unlisted county, Texas is a 27.0 MW hydro interconnection project with a current status of active. It is proposed to connect at Rich 138 kV substation.

27.0 MWCapacity
ActiveStatus
MISOMarket
HydroTechnology

Project facts

Canonical nameMISO Queue Project E291 — Hydro in an unlisted county, Texas
Queue IDE291
Statusactive
Source statusactive
MarketMISO
TechnologyHydro
Capacity27.0 MW
StateTexas
County
Point of interconnectionRich 138 kV substation
Requested (queue) date2012-05-15
Proposed in-service date2016-01-31
Operational date2020-07-27
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.