MISO Queue Project G170 — Coal in Washington, Minnesota is a 20.0 MW coal interconnection project in Washington, Minnesota with a current status of operational. It is proposed to connect at King Substation.

20.0 MWCapacity
OperationalStatus
MISOMarket
CoalTechnology

Project facts

Canonical nameMISO Queue Project G170 — Coal in Washington, Minnesota
Queue IDG170
Statusoperational
Source statusoperational
MarketMISO
TechnologyCoal
Capacity20.0 MW
StateMinnesota
CountyWashington
Point of interconnectionKing Substation
Requested (queue) date2002-01-16
Proposed in-service date2006-12-31
Operational date2006-12-31
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata