MISO Queue Project G263 — Wind in Martin, Minnesota

MISO Queue Project G263 — Wind in Martin, Minnesota is a 105.0 MW wind interconnection project in Martin, Minnesota with a current status of operational. It is proposed to connect at Lakefield Generating Substation.

105.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G263 — Wind in Martin, Minnesota
Queue IDG263
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity105.0 MW
StateMinnesota
CountyMartin
Point of interconnectionLakefield Generating Substation
Requested (queue) date2002-10-22
Proposed in-service date2007-11-01
Operational date2007-11-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata