MISO Queue Project G352 — Gas in Dakota, Minnesota

MISO Queue Project G352 — Gas in Dakota, Minnesota is a 200.0 MW gas interconnection project in Dakota, Minnesota with a current status of withdrawn. It is proposed to connect at Dakota County 345 kV Substation.

200.0 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project G352 — Gas in Dakota, Minnesota
Queue IDG352
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyGas
Capacity200.0 MW
StateMinnesota
CountyDakota
Point of interconnectionDakota County 345 kV Substation
Requested (queue) date2003-07-02
Proposed in-service date2011-11-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.