MISO Queue Project G358 — Wind in Faribault, Minnesota

MISO Queue Project G358 — Wind in Faribault, Minnesota is a 36.0 MW wind interconnection project in Faribault, Minnesota with a current status of operational. It is proposed to connect at Winco - Winnebago 161kV.

36.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G358 — Wind in Faribault, Minnesota
Queue IDG358
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity36.0 MW
StateMinnesota
CountyFaribault
Point of interconnectionWinco - Winnebago 161kV
Requested (queue) date2003-09-30
Proposed in-service date2003-09-01
Operational date2003-09-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata