MISO Queue Project G370 — Gas in Minnehaha, South Dakota

MISO Queue Project G370 — Gas in Minnehaha, South Dakota is a 205.0 MW gas interconnection project in Minnehaha, South Dakota with a current status of operational. It is proposed to connect at Anson 4.

205.0 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project G370 — Gas in Minnehaha, South Dakota
Queue IDG370
Statusoperational
Source statusoperational
MarketMISO
TechnologyGas
Capacity205.0 MW
StateSouth Dakota
CountyMinnehaha
Point of interconnectionAnson 4
Requested (queue) date2003-10-17
Proposed in-service date2007-12-01
Operational date2007-12-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata