MISO Queue Project G412 — Coal in Sangamon, Illinois

MISO Queue Project G412 — Coal in Sangamon, Illinois is a 200.0 MW coal interconnection project in Sangamon, Illinois with a current status of operational. It is proposed to connect at Dallman Substation (138 kV).

200.0 MWCapacity
OperationalStatus
MISOMarket
CoalTechnology

Project facts

Canonical nameMISO Queue Project G412 — Coal in Sangamon, Illinois
Queue IDG412
Statusoperational
Source statusoperational
MarketMISO
TechnologyCoal
Capacity200.0 MW
StateIllinois
CountySangamon
Point of interconnectionDallman Substation (138 kV)
Requested (queue) date2004-03-03
Proposed in-service date2004-03-01
Operational date2004-03-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata