MISO Queue Project G417 — Other in Scott, Minnesota

MISO Queue Project G417 — Other in Scott, Minnesota is a 15.0 MW other interconnection project in Scott, Minnesota with a current status of operational. It is proposed to connect at Shakopee - Scott 69 kV.

15.0 MWCapacity
OperationalStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameMISO Queue Project G417 — Other in Scott, Minnesota
Queue IDG417
Statusoperational
Source statusoperational
MarketMISO
TechnologyOther
Capacity15.0 MW
StateMinnesota
CountyScott
Point of interconnectionShakopee - Scott 69 kV
Requested (queue) date2004-03-22
Proposed in-service date2006-06-01
Operational date2006-06-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata