MISO Queue Project G442 — Wind in Cottonwood, Minnesota

MISO Queue Project G442 — Wind in Cottonwood, Minnesota is a 50.0 MW wind interconnection project in Cottonwood, Minnesota with a current status of operational. It is proposed to connect at Storden 69 KV.

50.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G442 — Wind in Cottonwood, Minnesota
Queue IDG442
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity50.0 MW
StateMinnesota
CountyCottonwood
Point of interconnectionStorden 69 KV
Requested (queue) date2004-08-18
Proposed in-service date2010-06-01
Operational date2010-06-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.