MISO Queue Project G484 — Coal in Switzerland, Indiana

MISO Queue Project G484 — Coal in Switzerland, Indiana is a 1,290.0 MW coal interconnection project in Switzerland, Indiana with a current status of withdrawn. It is proposed to connect at Egypt Bottom 345 kV Substation.

1,290.0 MWCapacity
WithdrawnStatus
MISOMarket
CoalTechnology

Project facts

Canonical nameMISO Queue Project G484 — Coal in Switzerland, Indiana
Queue IDG484
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyCoal
Capacity1,290.0 MW
StateIndiana
CountySwitzerland
Point of interconnectionEgypt Bottom 345 kV Substation
Requested (queue) date2004-11-24
Proposed in-service date2004-10-31
Operational date
Withdrawn date2006-09-20
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata