MISO Queue Project G505 — Coal in Williamson, Illinois

MISO Queue Project G505 — Coal in Williamson, Illinois is a 150.0 MW coal interconnection project in Williamson, Illinois with a current status of withdrawn. It is proposed to connect at East/West Frankfort Substation.

150.0 MWCapacity
WithdrawnStatus
MISOMarket
CoalTechnology

Project facts

Canonical nameMISO Queue Project G505 — Coal in Williamson, Illinois
Queue IDG505
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyCoal
Capacity150.0 MW
StateIllinois
CountyWilliamson
Point of interconnectionEast/West Frankfort Substation
Requested (queue) date2005-03-16
Proposed in-service date
Operational date
Withdrawn date2005-08-01
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata