MISO Queue Project G512 — Gas in Ford, Illinois

MISO Queue Project G512 — Gas in Ford, Illinois is a 70.0 MW gas interconnection project in Ford, Illinois with a current status of withdrawn. It is proposed to connect at Gibson City South 138 kV Substation.

70.0 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project G512 — Gas in Ford, Illinois
Queue IDG512
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyGas
Capacity70.0 MW
StateIllinois
CountyFord
Point of interconnectionGibson City South 138 kV Substation
Requested (queue) date2005-04-15
Proposed in-service date2005-07-01
Operational date
Withdrawn date2006-09-07
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata