MISO Queue Project G519 — Coal in Itasca, Minnesota

MISO Queue Project G519 — Coal in Itasca, Minnesota is a 600.0 MW coal interconnection project in Itasca, Minnesota with a current status of withdrawn. It is proposed to connect at Blackberry 230/115kV Substation.

600.0 MWCapacity
WithdrawnStatus
MISOMarket
CoalTechnology

Project facts

Canonical nameMISO Queue Project G519 — Coal in Itasca, Minnesota
Queue IDG519
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyCoal
Capacity600.0 MW
StateMinnesota
CountyItasca
Point of interconnectionBlackberry 230/115kV Substation
Requested (queue) date2005-05-19
Proposed in-service date2006-10-01
Operational date
Withdrawn date2013-05-07
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata