MISO Queue Project G539 — Hydro in Bracken, Kentucky

MISO Queue Project G539 — Hydro in Bracken, Kentucky is a 80.0 MW hydro interconnection project in Bracken, Kentucky with a current status of withdrawn. It is proposed to connect at 2 miles south of Meldahl Dam at existing 138 kV KU line..

80.0 MWCapacity
WithdrawnStatus
MISOMarket
HydroTechnology

Project facts

Canonical nameMISO Queue Project G539 — Hydro in Bracken, Kentucky
Queue IDG539
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyHydro
Capacity80.0 MW
StateKentucky
CountyBracken
Point of interconnection2 miles south of Meldahl Dam at existing 138 kV KU line.
Requested (queue) date2005-08-15
Proposed in-service date2007-09-30
Operational date
Withdrawn date2005-10-13
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.