MISO Queue Project G545 — Wind in Henry, Illinois

MISO Queue Project G545 — Wind in Henry, Illinois is a 200.0 MW wind interconnection project in Henry, Illinois with a current status of operational. It is proposed to connect at East Kewanee 138 kV Substation.

200.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G545 — Wind in Henry, Illinois
Queue IDG545
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity200.0 MW
StateIllinois
CountyHenry
Point of interconnectionEast Kewanee 138 kV Substation
Requested (queue) date2005-09-07
Proposed in-service date2007-12-31
Operational date2007-12-31
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata