MISO Queue Project G581 — Coal in Oliver, North Dakota
MISO Queue Project G581 — Coal in Oliver, North Dakota is a 600.0 MW coal interconnection project in Oliver, North Dakota with a current status of withdrawn. It is proposed to connect at Center 345 kV bus at the Milton R. Young Plant.
600.0 MWCapacity
WithdrawnStatus
MISOMarket
CoalTechnology
Project facts
| Canonical name | MISO Queue Project G581 — Coal in Oliver, North Dakota |
|---|---|
| Queue ID | G581 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Coal |
| Capacity | 600.0 MW |
| State | North Dakota |
| County | Oliver |
| Point of interconnection | Center 345 kV bus at the Milton R. Young Plant |
| Requested (queue) date | 2005-12-27 |
| Proposed in-service date | 2010-03-27 |
| Operational date | — |
| Withdrawn date | 2008-07-01 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata