MISO Queue Project G581 — Coal in Oliver, North Dakota

MISO Queue Project G581 — Coal in Oliver, North Dakota is a 600.0 MW coal interconnection project in Oliver, North Dakota with a current status of withdrawn. It is proposed to connect at Center 345 kV bus at the Milton R. Young Plant.

600.0 MWCapacity
WithdrawnStatus
MISOMarket
CoalTechnology

Project facts

Canonical nameMISO Queue Project G581 — Coal in Oliver, North Dakota
Queue IDG581
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyCoal
Capacity600.0 MW
StateNorth Dakota
CountyOliver
Point of interconnectionCenter 345 kV bus at the Milton R. Young Plant
Requested (queue) date2005-12-27
Proposed in-service date2010-03-27
Operational date
Withdrawn date2008-07-01
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata