MISO Queue Project G728 — Wind in Steele, Minnesota

MISO Queue Project G728 — Wind in Steele, Minnesota is a 300.0 MW wind interconnection project in Steele, Minnesota with a current status of withdrawn. It is proposed to connect at Byron - W. Owatonna 161 kV.

300.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G728 — Wind in Steele, Minnesota
Queue IDG728
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity300.0 MW
StateMinnesota
CountySteele
Point of interconnectionByron - W. Owatonna 161 kV
Requested (queue) date2007-01-24
Proposed in-service date2008-12-31
Operational date
Withdrawn date2007-02-28
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.