MISO Queue Project G741 — Geothermal+Other in Martin, Minnesota

MISO Queue Project G741 — Geothermal+Other in Martin, Minnesota is a 8.0 MW geothermal+other interconnection project in Martin, Minnesota with a current status of operational. It is proposed to connect at Near Alliant 69kV line.

8.0 MWCapacity
OperationalStatus
MISOMarket
Geothermal+OtherTechnology

Project facts

Canonical nameMISO Queue Project G741 — Geothermal+Other in Martin, Minnesota
Queue IDG741
Statusoperational
Source statusoperational
MarketMISO
TechnologyGeothermal+Other
Capacity8.0 MW
StateMinnesota
CountyMartin
Point of interconnectionNear Alliant 69kV line
Requested (queue) date2007-02-16
Proposed in-service date2011-03-11
Operational date2011-03-11
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata