MISO Queue Project G745 — Wind in White, Indiana

MISO Queue Project G745 — Wind in White, Indiana is a 130.0 MW wind interconnection project in White, Indiana with a current status of withdrawn. It is proposed to connect at NIPSCO Westwood - S. Prairie 138kV.

130.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G745 — Wind in White, Indiana
Queue IDG745
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity130.0 MW
StateIndiana
CountyWhite
Point of interconnectionNIPSCO Westwood - S. Prairie 138kV
Requested (queue) date2007-02-20
Proposed in-service date2010-12-31
Operational date
Withdrawn date2008-11-12
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata