MISO Queue Project G922 — Other in Carroll, Illinois

MISO Queue Project G922 — Other in Carroll, Illinois is a 120.0 MW other interconnection project in Carroll, Illinois with a current status of withdrawn. It is proposed to connect at Savana -York 161kV.

120.0 MWCapacity
WithdrawnStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameMISO Queue Project G922 — Other in Carroll, Illinois
Queue IDG922
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyOther
Capacity120.0 MW
StateIllinois
CountyCarroll
Point of interconnectionSavana -York 161kV
Requested (queue) date2007-12-03
Proposed in-service date2017-03-31
Operational date
Withdrawn date2010-11-15
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata