MISO Queue Project G966 — Wind in Ford, Illinois

MISO Queue Project G966 — Wind in Ford, Illinois is a 100.0 MW wind interconnection project in Ford, Illinois with a current status of withdrawn. It is proposed to connect at East Paxton 138kV substation.

100.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G966 — Wind in Ford, Illinois
Queue IDG966
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity100.0 MW
StateIllinois
CountyFord
Point of interconnectionEast Paxton 138kV substation
Requested (queue) date2009-02-20
Proposed in-service date2010-12-31
Operational date
Withdrawn date2012-08-28
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.