MISO Queue Project G993 — Wind in Kidder, North Dakota

MISO Queue Project G993 — Wind in Kidder, North Dakota is a 20.0 MW wind interconnection project in Kidder, North Dakota with a current status of withdrawn. It is proposed to connect at Proposed new sbstn or upgrded KEM 41.6 kV sbstn at N46 50 06/W104 14 22.

20.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G993 — Wind in Kidder, North Dakota
Queue IDG993
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity20.0 MW
StateNorth Dakota
CountyKidder
Point of interconnectionProposed new sbstn or upgrded KEM 41.6 kV sbstn at N46 50 06/W104 14 22
Requested (queue) date2008-03-31
Proposed in-service date2016-12-01
Operational date
Withdrawn date2008-05-15
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata