MISO Queue Project H094 — Wind in Vermilion, Illinois
MISO Queue Project H094 — Wind in Vermilion, Illinois is a 99.0 MW wind interconnection project in Vermilion, Illinois with a current status of operational. It is proposed to connect at 22 N Range: 12 West/1/50 miles west of Rossville, IL/138kV line.
Project facts
| Canonical name | MISO Queue Project H094 — Wind in Vermilion, Illinois |
|---|---|
| Queue ID | H094 |
| Status | operational |
| Source status | operational |
| Market | MISO |
| Technology | Wind |
| Capacity | 99.0 MW |
| State | Illinois |
| County | Vermilion |
| Point of interconnection | 22 N Range: 12 West/1/50 miles west of Rossville, IL/138kV line |
| Requested (queue) date | 2008-07-28 |
| Proposed in-service date | 2010-12-31 |
| Operational date | 2010-12-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata