MISO Queue Project IP01 — Wind in Mclean, Illinois

MISO Queue Project IP01 — Wind in Mclean, Illinois is a 50.0 MW wind interconnection project in Mclean, Illinois with a current status of withdrawn. It is proposed to connect at McLean County #6, 69 kV, Line 6612.

50.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project IP01 — Wind in Mclean, Illinois
Queue IDIP01
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity50.0 MW
StateIllinois
CountyMclean
Point of interconnectionMcLean County #6, 69 kV, Line 6612
Requested (queue) date2004-01-14
Proposed in-service date2012-12-01
Operational date
Withdrawn date2006-09-26
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata