MISO Queue Project J005 — Wind in Todd, Minnesota

MISO Queue Project J005 — Wind in Todd, Minnesota is a 17.5 MW wind interconnection project in Todd, Minnesota with a current status of withdrawn. It is proposed to connect at R34WT133N, Section 7, Bartlett Twp.

17.5 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J005 — Wind in Todd, Minnesota
Queue IDJ005
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity17.5 MW
StateMinnesota
CountyTodd
Point of interconnectionR34WT133N, Section 7, Bartlett Twp
Requested (queue) date2008-10-24
Proposed in-service date2009-12-31
Operational date
Withdrawn date2012-08-23
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.