MISO Queue Project J071 — Hydro in Bracken, Kentucky

MISO Queue Project J071 — Hydro in Bracken, Kentucky is a 112.0 MW hydro interconnection project in Bracken, Kentucky with a current status of withdrawn. It is proposed to connect at DEM Zimmer - Silver Grove 345 kV.

112.0 MWCapacity
WithdrawnStatus
MISOMarket
HydroTechnology

Project facts

Canonical nameMISO Queue Project J071 — Hydro in Bracken, Kentucky
Queue IDJ071
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyHydro
Capacity112.0 MW
StateKentucky
CountyBracken
Point of interconnectionDEM Zimmer - Silver Grove 345 kV
Requested (queue) date2009-09-30
Proposed in-service date2010-04-15
Operational date
Withdrawn date2011-08-11
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata