MISO Queue Project J123 — Nuclear in Goodhue, Minnesota
MISO Queue Project J123 — Nuclear in Goodhue, Minnesota is a 200.0 MW nuclear interconnection project in Goodhue, Minnesota with a current status of withdrawn. It is proposed to connect at Prairie Island 345kV.
200.0 MWCapacity
WithdrawnStatus
MISOMarket
NuclearTechnology
Project facts
| Canonical name | MISO Queue Project J123 — Nuclear in Goodhue, Minnesota |
|---|---|
| Queue ID | J123 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Nuclear |
| Capacity | 200.0 MW |
| State | Minnesota |
| County | Goodhue |
| Point of interconnection | Prairie Island 345kV |
| Requested (queue) date | 2010-04-19 |
| Proposed in-service date | 2011-12-31 |
| Operational date | — |
| Withdrawn date | 2013-03-14 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata