MISO Queue Project J126 — Wind in Winona, Minnesota

MISO Queue Project J126 — Wind in Winona, Minnesota is a 4.9 MW wind interconnection project in Winona, Minnesota with a current status of withdrawn. It is proposed to connect at ITC Midwest Rushford - Wilson 69kV.

4.9 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J126 — Wind in Winona, Minnesota
Queue IDJ126
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity4.9 MW
StateMinnesota
CountyWinona
Point of interconnectionITC Midwest Rushford - Wilson 69kV
Requested (queue) date2010-04-23
Proposed in-service date2012-10-30
Operational date
Withdrawn date2012-07-20
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata