MISO Queue Project J128 — Wind in Marshall, Illinois

MISO Queue Project J128 — Wind in Marshall, Illinois is a 100.0 MW wind interconnection project in Marshall, Illinois with a current status of withdrawn. It is proposed to connect at Oglesby - El Paso 138kV.

100.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J128 — Wind in Marshall, Illinois
Queue IDJ128
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity100.0 MW
StateIllinois
CountyMarshall
Point of interconnectionOglesby - El Paso 138kV
Requested (queue) date2010-04-26
Proposed in-service date2011-06-15
Operational date
Withdrawn date2012-08-28
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata