MISO Queue Project J159 — Wind in Macon, Illinois
MISO Queue Project J159 — Wind in Macon, Illinois is a 101.2 MW wind interconnection project in Macon, Illinois with a current status of withdrawn. It is proposed to connect at Ameren Latham - Decatur North 138 kV.
101.2 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology
Project facts
| Canonical name | MISO Queue Project J159 — Wind in Macon, Illinois |
|---|---|
| Queue ID | J159 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Wind |
| Capacity | 101.2 MW |
| State | Illinois |
| County | Macon |
| Point of interconnection | Ameren Latham - Decatur North 138 kV |
| Requested (queue) date | 2010-08-25 |
| Proposed in-service date | 2012-07-01 |
| Operational date | — |
| Withdrawn date | 2010-11-03 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.