MISO Queue Project J160 — Wind in Macon, Illinois

MISO Queue Project J160 — Wind in Macon, Illinois is a 101.2 MW wind interconnection project in Macon, Illinois with a current status of withdrawn. It is proposed to connect at Ameren Latham - Decatur North 138 kV.

101.2 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J160 — Wind in Macon, Illinois
Queue IDJ160
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity101.2 MW
StateIllinois
CountyMacon
Point of interconnectionAmeren Latham - Decatur North 138 kV
Requested (queue) date2010-08-25
Proposed in-service date2012-06-01
Operational date
Withdrawn date2010-10-19
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata