MISO Queue Project J163 — Wind in Tippecanoe, Indiana

MISO Queue Project J163 — Wind in Tippecanoe, Indiana is a 100.0 MW wind interconnection project in Tippecanoe, Indiana with a current status of withdrawn. It is proposed to connect at Klondike 138 kV Substation.

100.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J163 — Wind in Tippecanoe, Indiana
Queue IDJ163
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity100.0 MW
StateIndiana
CountyTippecanoe
Point of interconnectionKlondike 138 kV Substation
Requested (queue) date2010-09-10
Proposed in-service date2014-04-15
Operational date
Withdrawn date2012-08-22
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata