MISO Queue Project J164 — Wind in Erie, Ohio

MISO Queue Project J164 — Wind in Erie, Ohio is a 99.0 MW wind interconnection project in Erie, Ohio with a current status of withdrawn. It is proposed to connect at FE Beaver - Greenfield 138kV.

99.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J164 — Wind in Erie, Ohio
Queue IDJ164
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity99.0 MW
StateOhio
CountyErie
Point of interconnectionFE Beaver - Greenfield 138kV
Requested (queue) date2010-09-10
Proposed in-service date2014-12-31
Operational date
Withdrawn date2011-06-01
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.